The translocation of Tipu Sultan’s armoury at Srirangapatna to pave way for the double-tracking work of the Mysuru-Bengaluru Railway line was completed yesterday at 4.45 pm. This is a spectacular engineering effort and is the first such in India. The shifting of the 228-year-old and 1,050-tonne Tipu armoury began on Mar. 3. The armoury was turned in “L-shape” yesterday morning and was shifted in the evening. The final destination of the armoury is 130 metres from the Railway track. Works including strengthening of the base will be taken up next.
Tipu armoury moved to new location
The translocation of Tipu Sultan’s armoury at Srirangapatna to pave way for the double-tracking work of the Mysuru-Bengaluru Railway line was completed yesterday at 4.45 pm. This is a spectacular engineering effort…
Continue reading
Mysuru to get Township soon?
Karnataka Housing Board earmarks 1,900 acres near Bommanahalli in Yelwal hobli Submits proposal to State Govt. seeking land notification Mysuru: Amidst the ongoing Bidadi Township row where the farmers have been protesting…
MLC demands immediate appointment of MDA Commr.
Mysuru: Maintaining that Mysuru Development Authority (MDA) has been left orphaned by the Government with the non-appointment of a regular Commissioner, BJP MLC Raghu Kautilya alleged that the MDA has been virtually…
‘Let Suttur Seer inaugurate Dasara festivities this year’
Mysuru: The State Government should name Suttur Mutt Seer Sri Shivarathri Deshikendra Swamiji to inaugurate Dasara-2026 atop Chamundi Hill on Oct. 11, said BJP MLC Raghu Kautilya. Addressing a press meet at…






