Mysuru: Commuters between Mysuru and Kodagu via Thithimathi are a harried lot as bus services on the stretch has been cancelled following the caving in of a make-shift bridge that was built next to the new bridge that is being constructed. Though the makeshift bridge has been restored, heavy vehicles have been banned on the road.
Now the Public Works Department has stated that it will take over a month for the new bridge to be completed and for the heavy-vehicle traffic to be open.






