Mysuru/Nanjangud: With flood water receding at the stretch near Mallanamoole Mutt following reduction in discharge from Kabini Dam, the ever busy Mysuru-Nanjangud Road was re-opened for traffic at about 5 pm yesterday after a two-day blockade due to heavy water logging.
As Kabini River, which flows along Mysuru-Nanjangud Road near Mallanamoole Mutt, was in spate following copious rainfall in Wayanad and other catchment areas, the water from the river spilled over on to the nearby Highway causing water logging of 3 ft. deep at the stretch, following which the authorities blocked the road for vehicular movement from 9 am on Aug.8.






