Mysore/Mysuru: The construction of 10-lane Mysuru-Bengaluru Economic Corridor is in full swing and it is scheduled to be completed by October 2022. But the estimated cost of Rs. 8,066 crore might exceed by another Rs. 700 crore.
The corridor comprises a six-lane access-controlled carriageway for traffic to move at a high speed and a two-lane service road on either side for the benefit of local traffic.






