Mysuru: MP Pratap Simha inspected the ongoing works on grade separator on Hunsur Road near Hinkal junction, this morning and asked the Mysuru Urban Development Authority (MUDA), which has taken up the construction with an estimated cost of Rs.19.8 crore under the Jawaharlal Nehru National Urban Renewal Mission (JnNURM), to speed up the work.
The concrete blocks have to be placed underneath the overpass and it needs a lot of curing. Hence, the road has to be blocked for at least three months, informed MUDA Executive Engineer (EE) R.K. Raju to Pratap Simha.






