Mysuru: South Western Railway (SWR) will be carrying out critical engineering and signalling work (Non-Interlocking Work) from 10.12.2019 to 13.12.2019 in Banasandra Railway Station yard for doubling of track on Arasikere-Tumakuru section of Mysuru Division over SWR.
The following trains are cancelled/ diverted/ regulated on the dates mentioned against each:






